🛣️

Roads, Bridges & Cross-Drainage Culvert Works

At-a-Glance: Gulmohar executes highway alignment, mass rock excavation, sub-base compaction, and reinforced concrete cross-drainage structures across Jharkhand and Odisha. Our fleet includes heavy vibratory compactors, hydraulic rock breakers, and transit mixers.

Scope of Engineering Works

  • Dense bituminous macadam (DBM) and high-load rigid concrete pavement construction
  • Single-cell and multi-cell reinforced concrete box culverts (RCC) designed to IRC 112 standards
  • Deep rock trenching, blasting coordination, and causeway slope stabilization in tough basalt terrains
  • Stormwater longitudinal drains, kerbing, and highway safety signage installation

5-Step Engineering Methodology

STEP 1

Topographical Drone & Total Station Survey

Terrain contour mapping, cut-and-fill optimization, and hydraulic watershed run-off computation.

STEP 2

Sub-Grade Excavation & Stabilization

Grading with motor graders and 10-12 ton vibratory soil compactors to achieve 98% Proctor density.

STEP 3

Cross-Drainage & Culvert Casting

Structural casting of RCC box culverts and abutments to prevent monsoon washout.

STEP 4

Pavement Laying & Surface Rolling

Controlled temperature asphalt paving or automated slipform concrete laying with curing compounds.

Service Area & Deployment

Jharkhand mining corridors (Chatra, Bokaro, Ramgarh) and northern Odisha connectivity routes.

Frequently Asked Questions

What heavy machinery does Gulmohar deploy for road and bridge projects?

Our in-house fleet includes Volvo EC210D tracked excavators, Montabert hydraulic rock breakers, Dynapac vibratory rollers, and BharatBenz 10-wheel tipper dumpers.

Does Gulmohar build RCC box culverts according to Indian Roads Congress (IRC) standards?

Yes. All cross-drainage structures, culverts, and retaining causeways are engineered in strict conformance to IRC:112 and MoRTH specifications.